TD Insurance Claims Centre
TD Insurance Claims Centre
Project Summary
This project involved a complete retrofit of existing office space into a revamped office for TD Insurance and their Claims department.
Extending across floors 12, 14, and 18 in the Palliser One building located at 9 Avenue SE in downtown Calgary, the scope of work for this project included safe demolition and abatement of hazardous asbestos, complete demolition of existing mechanical and electrical systems, and full demolition of ceiling grid and partitions.
In the retrofit stage, SKYGRiD managed the complete rebuild of the 14th floor, including all mechanical electrical systems, altos wall partitions, ceiling space, direct connect adjustable desks through cored floor boxes, flooring, millwork, and further premium fixtures and finishes.
Once the 14th floor was granted occupancy, SKYGRiD moved to the 18th floor to demolish existing furniture, then to the 12th floor to complete demolition of the old TD Insurance space and retrofit about 25% of the floor area for further offices for TD Insurance.
SKYGRiD was also awarded work from the landlord (Aspen Properties) to retrofit the elevator lobby.